C5 Tech/How to and mods page

 

    Here is a list of items that I have personally installed and/or performed the work on my car.  These are here to help and guide you through your installs.  I do not in any way guarantee that these instructions will work nor will I warranty them in any way.  These instructions are to be used as a guide for people who would like to learn how to do the work themselves.

All of these installations are to be performed at your own risk!!!!

The Drivetrain and PCM

Hurst Shifter

Differential Remove and Replace with DTE Strut Brace
Output Shaft Seal Mike Mercury's Diff R&R
Engine Removal from the Top Dope's Clutch How To Write Up  (right click/save Word document)
ATI Super Damper Pics Cartek Clutch, Master Cylinder, Slave Cylinder Install Pics
Fidanza Steel Billet Flywheel Pics Driveshaft Coupler Pics
PCM Removal  

 

Fuel, induction, and exhaust

VaraRam CAI LGM Pro Long Tubes with Borla Stingers
Racetronix Fuel System Kenne Bell Boost A Pump

ECS Methanol Kit

Fuel Filter Replacement

 

Chassis, brakes, and suspension
 

Custom Six Point Roll Cage

(installed, pics coming soon)

DRM C5 Brake Cooling Duct Kit

 

 

Power Adders

STS Twin Turbo Install Pics

 

 

 

Accessories

Hypertech Thermostat Cartek Line Lock
Gauge Install Pics Greddy Electronic Boost Controller
Bellhousing Blanket  

 

 

Appearance Mods

Aluminum Gauge Bezels Paint Your Hoodliner
Vette Essentials Interior Pics Fan Shroud Chrome
Custom Airbrushed (by ChevyChad) Fuel Rail Covers, Intake, Coolant Resevoir, Washer Resevoir and Radiator Support

(pics coming soon)  

Other Chrome Under the Hood

(pics coming soon)

 

OEM Blacked Out Lights

(pics coming soon)

 

 

Rear Facsia Paint (Blackout)

(pics coming soon)

 

L.S.D. Vertical Doors  

 

 

The Audio corner

I believe I have taken on quite a project with this installation.  This is the first time I've ever attempted to use fiberglass period.  I didn't even know what fiberglass resin looked like until I opened up the can.  This project is taking some time but I am satisfied with the work so far.  I am posting only what I have done so far as this project is still going on.  The project has come to a halt due to the massive go fast project I intervened with.  I want to get some track times before adding all the extra weight of this system.  All components are in my possession and this project should be completed in early Spring 2006.  I will post more when it is available. Here are the main components:

    So, here are the things that I have done so far:

Sound Deadening Wiring and Interconnects
Box Construction Eclipse AVN-5435 (in progress now)
Speakers (in line for install) The Big 3 (in line for install)

 

  

Miscellaneous Projects

The Garage!!!!  

 

Back to Vette Page

 

 

Fast Cash Payroll Loans